South Park Bridge Committee 6/12/22

We had 7 persons attend a strategy session regarding the south park bridge. 3 board members were present (Chris, John, Bob) and 4 residents. We reviewed the site and the options and decided that option 4 was preferred.


It should be noted that two of the homeowners were opposed to building any sort of bridge in the South Park, however the rest generally supported a bridge. They recommended that we survey the community at the annual meeting.



South Park Bridge


Options


#1 Hire Contractor to install pedestrian bridge. Approximate cost $20,000


#2 Install Culvert. Backfill soil over the top. Approximate cost – Unknown


#3 Contractor does site prep, which includes removing vegetation, leveling the area and installing the foundations. Homeowners assemble the bridge. Cost less than $10,000


#4 Homeowners install entire bridge. This includes site prep with skid steer and tree removal, along with foundation installation. Approximate cost $5,000.


#5 Install temporary bridge using 5 gal buckets and concrete as foundations. Cost less than $300. See how much use it gets.


#6 Do nothing. Trails will end at creek. Cost = $0.00










18 views0 comments

Recent Posts

See All

New Board Meeting - Meeting Minutes

Note: These are unconfirmed until the next time the board meets; in the interest of transparency and timeliness we will begin posting unconfirmed meeting minutes on this blog. —5/15/24 – Minutes Start

Annual Meeting - Meeting Minutes

Annual Meeting Minutes May 9, 2024 Call Business Meeting To Order: 7:05 pm Roll Call: Quorum Met Board Members Present: Bob, Anh, John, Megan, Colleen, Chris Compass Management Present: Stacey Sherril

Meeting Minutes

Hi all, Our meeting minutes documents are posted on the following webpage: https://www.warnercreek.org/general-5 Keep in mind that this page only dates back to 2022; older meeting minutes will be prov

Comments


bottom of page